Projects and Publications

2012 Publications

Category Bibliographic Citation*

Refereed Journals    

  1. Sibanyama G, M Muya and C Kaliba (2012)  An overview of construction claims: A case study of the Zambian construction industry, International Journal of Construction Management, Volume 12 Number 1, pp 65 – 81, ISSN: 15623599, The Chinese Research Institute of Construction Management
  2. Zulu, A., Mecrow, B.C., and Armstrong, M. (2012) Permanent-magnet flux-switching synchronous motor employing a segmental rotor. IEEE Transactions on Industry Applications, 48 (6), 2259-2267. ISSN: 0093-9994. DOI: http://dx.doi.org/10.1109/TIA.2012.2226922
  3. Zulu, A., Mecrow, B.C., and Armstrong, M. (2012) Investigation of the dq-equivalent model for performance prediction of flux-switching synchronous motors with segmented rotors. IEEE Transactions on Industrial Electronics, 59 (6), 2393-2402. ISSN: 0278-0046. DOI: http://dx.doi.org/10.1109/TIE.2011.2158043
  4. Virdy S.S. (2012) Performance Testing of Forced Convection Solar Fish Dryers, The Zambian Engineer, Vol. 45 No. 1, pp 44-55. ISSN 1608-6678.
  5. Sibooli,H, Banda, .N and Phiri,Z (2012) Incentives for Water and Sanitation Utility Companies to Serve the Urban Poor in Zambia to Attain the MDGs. The Zambian Engineer, Vol. 45 No. 1. ISSN 1608-6678.


Refereed Proceedings of Conference    

  1. Mukalula P M and M Muya (2012)  Understanding risks in Public Private Partnership construction projects in Zambia, 1st International Conference on Infrastructure Development in Africa, 22-24 March 2012, Conference Proceedings, pp 541-558, College of Architecture and Planning, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana
  2. Mukumbwa B and M Muya(2012) Unethical Practices in the Construction Industry in Zambia,Relevance of Engineering in Sustainable Wealth Creation, Conference Proceedings, pp 58 - 68, 13 April 2012, Engineering Institution of Zambia, Livinstone, Zambia
  3. Kaliba C, M Muya and B Sichombo (2012) Knowledge Creation, Integration and Management in Civil Engineering Consulting Industry:  Opportunities and Challenges. Relevance of Engineering in Sustainable Wealth Creation, Conference Proceedings, pp 47 – 57, 13 April 2012, Engineering Institution of Zambia, Livingstone, Zambia
  4. Nyirenda E. (2012) Development of a Water Resource Allocation Tool for the Upper Lunsemfwa Catchment in Zambia. Proceedings, Harnessing Water for Social and Economic Benefits, Zambia Water Forum and Exhibition, New Government Complex, Lusaka, 5-6 November.
  5. Mwewa, M., Rajan, R., Zulu, A., and Sibanda, P. (2012) Construction of a centralised microprocessor based smart metering system with optimised scheduling of energy usage. In: Proceedings of the South African Institute of Physics, SAIP 2012, 9-13 July 2012, Pretoria, South Africa.
Engineering